Sunday, 18 June 2017

Phase 5 of BzB = DONE!



I reckon you could say that so far BzB has had 5 main phases so far - the piecing, designing/drawing/tracing the whole cloth pattern, quilting the main motifs, quilting the background and finally, after a very long 2 weeks - the colouring/painting. I have to admit that this stage felt everlasting at times. I even got a blister on my pencil-gripping finger callous. I listened to repeats of repeats on the radio but I am now very up date with current affairs. 






I ordered a battery operated pencil sharpener which is even more satisfying to use than my school-teacher hand crank one and I find that one pretty entertaining. 

The next stage is to quilt around the main motifs again with wool thread which will be SCARY! I have even agreed with myself to do less stitching than I had originally considered but even so, it will probably take around 10 days if all goes well. 





Bumble has been someone to talk to in my self-imposed exile, just making herself comfy on the floor nearby. Or even, making herself comfy on humans who happen to be lying on the floor, always keeping a weather eye out for grumpy, nose-out-of-joint cats;)

Sunday, 11 June 2017

Beezlebub's Endurance Test







I can’t remember a quilt project being quite as all consuming as Beelzebub since the Yurt or The Smart Car. If anything, this quilt is even more intense as there is a tight deadline  to get it finished in time for FOQ, taking into account the school holidays, and I want it to be over and beyond a basic bastardisation of a whole cloth quilt. If I had more time I would probably even add even more extras such as beads.

My days have involved at least 9 hours scribbling away with Derwent Intense pencils, carefully adding aloe-vera gel without splurging any onto the quilt background and using the smallest possible paintbrushes to add metallic paint highlights. I have not been anywhere or seen anyone except for a mad dash to the grocery shop for essentials or walking the dogs in the persistent rain. My emails remain unanswered and a pile of unopened post is stacking up on my desk.

The General Election largely passed me by, apart from the incessant analysis on Radio 4. I am now convinced that one of the characters from farming soap, The Archers, will either die or run away at the Isle of Wight Festival just to spice the listeners’ lives up a bit. I think that most of the British Public will feel strike poses like Bumble if we are faced with yet another election in the near future…



If I manage to put in the same amount of time in the coming week I may just finish the colouring to allow a maximum of two weeks for the second quilting on the large motifs. That is actually beginning to worry me - do I honestly think I can stitch right on top of the previous stitching with wool thread, around the coloured or painted sections with absolutely nowhere to hide? 

It would be nice to think that the next project I do may be slightly easier or at least smaller;)






Sunday, 4 June 2017

Missing in Action




There almost was no blogpost this evening as I have been totally absorbed with adding colour to Beelzebub with Derwent Intense pencils and a gel to blend them in. I feel that I have bitten off far more than I can chew as just doing the bottom row of feathers took 3 days and I am not entirely happy with how they look in real life. I reckon coloring the entire quilt could take 2 weeks and I still have to requilt and add longarm embroidery to the large motifs. It really will be down to the wire with this quilt to get it done by the end of the school year! This is possibly one of my most stressful projects to date. At least I am up to date with current affairs by listening to Radio 4 for hours on end…