Almost all I thought about this week was figuring out how to join the top and bottom halves of Freya’s frock and get the zip in, having deviated way off the original printed pattern’s instructions. It would have been FAR more sensible to put the zip into the entire back first before joining the sides but we were too worried about getting the fit right and attaching lurex binding to the neck and arm holes. The biggest worry was the strangely crinkly, flimsy fabric for the skirt which kept shifting, puckering and shredding thread. Getting the darts in at all was miraculous and then there was the challenge of distributing the skirt fabric around a piece of bias tape that served as a sort of waistband that tacked onto the bodice.
We must have had 3 or 4 goes at getting the zip into the skirt, even resorting to sewing it by hand. It is just a little gappy so I have decided that when Freya wears it for her Prom I will put in a few little stitches after it is zipped up to keep everything tidy. Apart from that the zip is now nice and robust and the dress fits remarkably well. After experimenting with scraps of crinkly fabric to work out how to do the hem, I think we have decided not to sew it at all since it does not even fray and it will allow the skirt to drape better. I just hope that it won’t look too obviously ‘home-made”…
After a bit of a palaver, I managed to enter “Dunes” into Paducah. I could not upload photos from my Mac so I had to borrow Freya’s laptop. I had hoped to enter “Odin’s Trilogy” or even just one of the trio but they did not fit into any of the AQS size categories for small or large wall quilts.
There were other interruptions such as a trip to the orthodontist to get Nell’s first set of braces and helping Mo to shift the last of her stuff from her upholstery workshop back to a workroom at her house. I also collected “Copper Capercaillie” from the picture framer who had cleverly managed to leave the back exposed and I dropped it off at a gallery to see if a buyer could be found.
My Millie machine with QP did a great job of quilting poinsettias across a Christmas quilt and I managed to give the Lenni longarm a service in between commands since he might soon be on his way to a new owner in France.
While not worrying about the Prom Frock I have been worrying about getting the E-book finished so I devoted some time to editing photos and instructions for 3 projects. If I can get the next two large custom quilts completed the next thing I want to do is take step-by-step pictures of the leather evening bags which should be the final book project. Unfortunately, my plans could be scuppered when I have to face the fact that Christmas is coming and I have not yet done anything about it ;)
No comments:
Post a Comment